Case Studies

Wallsend (Newcastle) School

New buildings additional to the school required surface water drain nearly 400metres to the nearest burn. Like many of our schools clients, the work needed to be completed out of term time.

Read Full Story →

Oulton Park Race Track

Installation of cable ducts were required under the race track for arobust system of new marshalling cameras.
The primary objective was to cut costs and improve accuracy by automating the camera/photo recording system.

Read Full Story →

Tesco Wind Turbines

Tesco required two 160mm ducts for power cables from its’ new wind turbine at its’ Northampton distribution centre on the edge of the M1. The ducts needed to be installed under the reinforced concrete road to the entrance of the ware house for the use of the delivery trucks.

Read Full Story →